+917292009966 +917292006699 Whatsapp
Tasha Realty
 
 

News: Roads in sectors 9, 10 in a shambles: Residents-13-09-2021

https://timesofindia.indiatimes.com/city/gurgaon/roads-in-sectors-9-10-in-a-shambles-residents/articleshow/86150701.cms

 

Gurgaon: Residents of HSVP sectors 9, 9A, and 10A have expressed concern over the dilapidated condition of the internal and the main roads in the area. They alleged that no repair and recarperting has been initiated by the civic authorities despite numerous complaints over the years.
They said that the roads riddled with potholes are causing a lot of inconvenience for the commuters and pedestrians. Residents blamed the local elected representatives and authority concerned for the pathetic condition of the road.
Prashant Chauhan, RWA president of Sector 9, said, “The main sector road connecting the civil hospital is in a pathetic condition as no maintenance has been carried out in the past 4 years. We have also spent from our pocket to fill the potholes as it is extremely difficult to drive on the stretch. The situation has only worsened during the rainy season and despite our numerous complaints nothing has been done to provide relief.”

Lalit Suraj Bhola, general secretary of RWA 9A, said that the condition of the internal roads were no different. “Those were built five years ago and didn’t last even one monsoon. When the sectors were transferred to MCG, RMC roads were built only in a few pockets,” he said.

A few pockets in Sector 10A are awaiting roads and some lanes need urgent repairs. “We fail to understand why the civic body is recarpeting the roads that are in good condition and not paying any heed to the ones in a shambles. In one pocket, they have started roadwork without even dismantling the road and that has raised the road level. They are also not constructing any drain to reduce waterlogging,” said Udayvir Yadav, RWA president of Sector 10A

 

Meanwhile, the MCG maintained that they are working on it. “We are starting the patch work on the Sector 9 connecting road. The estimate for the construction of an internal road in Sector 9A has been sent for approval. As the sector is located in a low-lying area, the road will be made using interlocking paver blocks. Road repair in Sector 10A will be carried out after the monsoon,” an MCG official said.

DISCLAIMER: This website and the Information contained is in the process of being updated and the contents are under review/revision in terms of the Real Estate Regulation Act, 2016 and Rules there under (RERA), and will be reviewed from time to time. Till the time that the contents are fully updated, the same shall neither be construed to be any kind of advertisement, solicitation, marketing, Booking, offer for sale, invitation to offer within the purview of RERA and shall have no binding effect on the Company and nor constitute any offer and/or acceptance and/or contract and/or agreement and/or transaction and/or any intention thereof and/or a disclosure under any statute of any nature whatsoever. Please call to check the updated pricing, status etc. The photographs contained herein may be actual/stock/standard photography or rendered images used for the purpose and have been taken at a location other than the project site and are used to indicate a conceptual lifestyle. Actual product may vary/differ from what is indicated herein. The location info shown are indicative and selective representation of certain elements present/that may be present in and around the city/project site. No representations are made regarding existence/continuity of existence of any landmarks/locations shown. The landmarks/locations may be subject to change from time to time and such changes are completely outside our control. No representation or warranty is made or intended as to the accuracy or completeness of information under this website or as to its suitability or adequacy for any purpose. Before making a decision to purchase, you are requested to independently, either directly or through your legal/financial consultants, thoroughly verify all details/documents pertaining to the respective project as available on the respective RERA sites.The Company is not liable for any consequence of any action taken by the viewer relying only on such material/ information that is presently displayed on this website.