+917292009966 +917292006699 Whatsapp
Tasha Realty
 
 

News: MCD changes building plan sanction fee, houses to cost more in east & south Delhi-2-11-2023

https://realty.economictimes.indiatimes.com/news/industry/mcd-changes-building-plan-sanction-fee-houses-to-cost-more-in-east-south-delhi/104903386?utm_source=tagListing&utm_medium=tagListing

: Municipal Corporation of Delhi (MCD) has decided to levy a compensatory regulatory charge, an additional fee to be paid to get the building plan sanctioned for all properties, including residential ones, to strengthen the civic infrastructure.

Officials said the fee was so far levied in the areas under the erstwhile north corporation, and since the unification of the three civic bodies, there was a constant demand for its implementation across the MCD jurisdiction. "The decision will automatically increase the cost of constructing houses in Delhi, especially in south and east Delhi, where this additional charge wasn't levied earlier," said the official.

The unified building by-laws mandate MCD to impose charges while sanctioning the building plans. The collected amount will be used for maintenance and development of the civic infrastructure in the MCD areas, including regularised colonies and village abadis. The charges on the proposed built-up area of a property will be determined based on the prevailing circle rate in that colony. For example, for a residential property in category A with a plot size up to

250 square metre, the charge will be Rs 387 per square metre. It will be Rs 122.70 per sqm for a similar plot in category B, Rs 79.90 in category C, Rs 63.80 in category D and Rs 35 in category E. For residential plots over 250 sq metre, Rs 774 per sqm will be charged in category A, Rs 245.50 in category B, Rs 159.80 in category C, Rs 127 in category D and Rs 70 in category E.

Civic officials came with the proposal for the uniform charge on September 5, but the House was adjourned. Several institutions, which are developed on huge plots while the buildings occupy only a portion, also demanded rationalisation of the charges that were levied on the entire plot. "Based on these suggestions, it was decided that the charges would be calculated on the basis of the total built-up area rather than the size of the entire plot," said the official.

The proposal was tabled in the House again on Tuesday and it was approved. The charges will be levied while getting the building sanction plan approved from MCD for a new or an additional structure, it stated.After Delhi Master Plan 2021, the number of permissible dwelling units has increased substantially and multiple units are being constructed by redeveloping single-unit buildings. "This has resulted in further densification of areas and requirement of funds to augment the existing infrastructure," the proposal stated

DISCLAIMER: This website and the Information contained is in the process of being updated and the contents are under review/revision in terms of the Real Estate Regulation Act, 2016 and Rules there under (RERA), and will be reviewed from time to time. Till the time that the contents are fully updated, the same shall neither be construed to be any kind of advertisement, solicitation, marketing, Booking, offer for sale, invitation to offer within the purview of RERA and shall have no binding effect on the Company and nor constitute any offer and/or acceptance and/or contract and/or agreement and/or transaction and/or any intention thereof and/or a disclosure under any statute of any nature whatsoever. Please call to check the updated pricing, status etc. The photographs contained herein may be actual/stock/standard photography or rendered images used for the purpose and have been taken at a location other than the project site and are used to indicate a conceptual lifestyle. Actual product may vary/differ from what is indicated herein. The location info shown are indicative and selective representation of certain elements present/that may be present in and around the city/project site. No representations are made regarding existence/continuity of existence of any landmarks/locations shown. The landmarks/locations may be subject to change from time to time and such changes are completely outside our control. No representation or warranty is made or intended as to the accuracy or completeness of information under this website or as to its suitability or adequacy for any purpose. Before making a decision to purchase, you are requested to independently, either directly or through your legal/financial consultants, thoroughly verify all details/documents pertaining to the respective project as available on the respective RERA sites.The Company is not liable for any consequence of any action taken by the viewer relying only on such material/ information that is presently displayed on this website.